All Forums Viewpoint
Kishore_1 208 posts Joined 03/10
20 Jul 2014
Reserved AWT pool

Is there any way we can see what are the reserved pool of AWTs configured for the system in Viewpoint?

Glass 225 posts Joined 04/10
21 Jul 2014

Kishore,
 
Providing you have access to Worklaod Designer , it's specified on the Workloads/Priority Distribution Tab.
 
Rglass

Kishore_1 208 posts Joined 03/10
27 Jul 2014

Thanks Rglass! I can find the number of reserved AWTs in my system at the Workload Designer->Workloads->Priority Distribution tab to be 5. Is there any way to find for which type of work these 5 AWTs are reserved?

Glass 225 posts Joined 04/10
28 Jul 2014

To answer that I'll refer you to Carrie's Blog.
She explains it so well.
http://developer.teradata.com/blog/carrie/2011/10/reserving-amp-worker-tasks-don-t-let-the-parameters-confuse-you

Kishore_1 208 posts Joined 03/10
29 Jul 2014

Thank you so much Rglass.The link provided above was indeed helpful in getting a clear idea.

You must sign in to leave a comment.